+86 13028953357
Keywords:
Search
On May 1, Labor Day, the construction of the roof cable structure of the Dalian Barracuda Bay Football Stadium project was completed on schedule, and it was a solid step forward from the perfect completion.
On the occasion of the May Day holiday, I would like to thank the people for their hard work and hard work. In response to the national unification, the company decided after the company's research that the May Da...
The development of green buildings and green building materials is the direction actively advocated by the state, and it is also an inevitable trend in the development of the construction industry.
The membrane structure project of Ningbo University of Nottingham outdoor sports ground reconstruction and expansion project is located in Ningbo University of Nottingham, No. 199 Taikang East Road, Ningbo, Z...
Guangzhou South Railway Station has a total investment of 13 billion yuan, a total steel consumption of 79,000 tons, about 1.7 times that of the National Stadium "Bird's Nest", and 1.5 million cubic meters of con...
Shaoxing International Exhibition exhibition mall curtain wall PTFE MESH membrane covers an area of 2,300 square meters fabric and steel usage reaches 100tons. The tensile structure was design/engineer/fab...
Congratulations to our company for winning the bid for the steel membrane structure project of Maliantan Desert Park in Dingbian, Shaanxi Province.
Special-shaped steel structures are also called spatially arbitrary steel structures. Generally, the spatial 3D model of the structure cannot simply use a function table.
The happy cargo yard project in Huaying Logistics Park, Sichuan Province is a comprehensive large-scale cargo yard under construction in eastern Sichuan, involving coal, building materials, petroleum, cold chain s...
Copyright © Zhejiang Wanhao Group Co., Ltd. All Rights Reserved.
Sitemap | Technical Support