Ningbo Wanhao Space Structure Engineering Co., Ltd. Industry leader brand
Business Line:

+86 13028953357

Home About Wanhao Wanhao Projects Contact Us

Search

Home / News / Wanhao News

Membrane structure installation of steel frame membrane shed construction project of Inner Mongolia Energy Great Wall Coal Preparation Plant

May. 24, 2021
Share

  The steel frame membrane shed construction project of Inner Mongolia Energy Great Wall No. 5 Coal Preparation Plant is located in the Great Wall No. 5 Coal Preparation Plant of Shanghai Miaozhen, Etuoke Qianqi, Inner Mongolia.

  The steel structure of the membrane structure canopy of this project is 40 meters in height, 115 meters in span, and the expanded area of the membrane structure is 25,000 square meters.

  The membrane structure is divided into 20 large membranes and 20 small membranes. At present, the sixth large membrane has been installed.

微信图片_20210524081051.jpg

微信图片_20210524081052.jpg

微信图片_202105240810522.jpg

微信图片_202105240810524.jpg

微信图片_20210524081441.jpg

  Looking forward to the completion of the entire project, to appreciate its unique style.

Home About WanhaoETFEPTFESpace Steel StructureWanhao ProjectsUnder ConstructionNewsContact Us
  • Service Line: +86 574 2886 7851 +86 18658257258
  • Business negotiation telephone: +86 130 2895 3357
  • Fax: +86 574 8849 2906
  • E-mail: sales@whmembrane.com
  • Address: 9F, Canghai Building, No.3388 Canghai Road, Ningbo, Zhejiang, China

Copyright © Ningbo Wanhao Space Structure Engineering Co., Ltd. All Rights Reserved.   

Sitemap | Technical Support   

Send a Message
Top