Search
Recently, Wanhao general manager Zhang general surprise inspection Xiangyang Olympic sports center membrane structure engineering construction site, meet the general contractor parties. They highly recognized and praised the efforts of Wanhao team in the Xiangyang Olympic Sports Center project. After listening to the work report and introduction of Wanhaofront-line management personnel, I am very satisfied with the effective measures and guarantees made for the project in rush period.
After several months of intensive work, the roof of PTFE membrane structure of Xiangyang Olympic Sports Center has been fully put into peak operation. In the hottest weather mixed with sweat and the most enthusiastic state to write the story of Wanhao space structure, the so-called art high people are bold and visionary, everyone on the scene through their most simple way of work to win the respect of all parties.
Salute to all the colleagues in the Xiangyang Project Department! Come on!
Copyright © Zhejiang Wanhao Group Co., Ltd. All Rights Reserved.
Sitemap | Technical Support