Search
The membrane structure project of the sewage pond of the industrial sewage plant in the Kunlun Industrial Zone of Golmud Industrial Park is located in Golmud City, Haixi Mongolian and Tibetan Autonomous Prefecture. This project is the first domestic ETFE membrane structure sewage pond covering project.
The project mainly constructs the second settling tank, hydrolysis acidification tank and pre-sedimentation tank insulation membrane structure installation of the first phase of the 25,000 cubic meters/day industrial sewage treatment plant in the Kunlun Industrial Zone of Golmud Industrial Park. The project uses 230 tons of steel, and the expanded area of the membrane structure is 5,100 square meters.
Copyright © Ningbo Wanhao Space Structure Engineering Co., Ltd. All Rights Reserved.
Sitemap | Technical Support