Ningbo Wanhao Space Structure Engineering Co., Ltd. Industry leader brand
Business Line:

+86 13028953357

Home About Wanhao Wanhao Projects Contact Us

Search

Home / News / Wanhao News

The large butterfly landscape membrane structure project in front of the Zhangjiagang high-speed railway station enters the second stage of the secondary struct

Jun. 04, 2021
Share

Recently, General Manager Zhang of Wanhao raided the construction site of the Big Butterfly Landscape Membrane Structure Project in front of Zhangjiagang High-speed Railway Station. After discussion by the owner, design institute, general contractor, supervision and other departments, the first butterfly wing unloading support reached an agreement and entered the second stage of the secondary structure and the assembly and hoisting process.

The large butterfly landscape membrane structure project in front of the Zhangjiagang high-speed railway station enters the second stage of the secondary struct

The large butterfly landscape membrane structure project in front of the Zhangjiagang high-speed railway station enters the second stage of the secondary struct

The large butterfly landscape membrane structure project in front of the Zhangjiagang high-speed railway station enters the second stage of the secondary struct

The large butterfly landscape membrane structure project in front of the Zhangjiagang high-speed railway station enters the second stage of the secondary struct

The large butterfly landscape membrane structure project in front of the Zhangjiagang high-speed railway station enters the second stage of the secondary struct

The large butterfly landscape membrane structure project in front of the Zhangjiagang high-speed railway station enters the second stage of the secondary struct

The large butterfly landscape membrane structure project in front of the Zhangjiagang high-speed railway station enters the second stage of the secondary struct

The large butterfly landscape membrane structure project in front of the Zhangjiagang high-speed railway station enters the second stage of the secondary structure assembly and hoisting

The large butterfly landscape membrane structure project in front of the Zhangjiagang high-speed railway station enters the second stage of the secondary structure assembly and hoisting

The large butterfly landscape membrane structure project in front of the Zhangjiagang high-speed railway station enters the second stage of the secondary structure assembly and hoisting

Continue to work hard for this project as the city's key quality excellence project. Congratulations to the partners of the Wanhao team on the scene for their hard work in creating high-quality projects and look forward to the wonderful display.

Home About WanhaoETFEPTFESpace Steel StructureWanhao ProjectsUnder ConstructionNewsContact Us
  • Service Line: +86 574 2886 7851 +86 18658257258
  • Business negotiation telephone: +86 130 2895 3357
  • Fax: +86 574 8849 2906
  • E-mail: sales@whmembrane.com
  • Address: 9F, Canghai Building, No.3388 Canghai Road, Ningbo, Zhejiang, China

Copyright © Ningbo Wanhao Space Structure Engineering Co., Ltd. All Rights Reserved.   

Sitemap | Technical Support   

Send a Message
Top