Search
The all day long wharf warehouse building in Indonesia is now being constructed with heavy lifting. In the face of this major epidemic, workers are still fearless of difficulties and dangers and rush to the site for intensive construction.
The project is a grid structure with a height of 55 meters and a span of 160 meters. The steel structure is assembled on the ground and the whole area is hoisted. The total amount of steel is 2000 tons, the membrane structure is 30000 square meters, and the housing structure is built by Ningbo Marriott Space Structure Co., Ltd.
The project is located in Indonesia, with a typical tropical rainforest climate and high temperature throughout the year. Affected by the monsoon in the southern hemisphere, the rainfall is abundant and the rainy season is long, which will bring new challenges to our company's construction.
At present, the project has entered into the installation stage of main grid steel structure and secondary steel structure. Wanhao will live up to the expectations and create brilliant future.
Copyright © Ningbo Wanhao Space Structure Engineering Co., Ltd. All Rights Reserved.
Sitemap | Technical Support