Ningbo Wanhao Space Structure Engineering Co., Ltd. Industry leader brand
Business Line:

+86 13028953357

Home About Wanhao Wanhao Projects Contact Us

Search

Home / News / Wanhao News

The 15th bid of Wanhao 2020-Golmud Industrial Park Kunlun Industrial Zone Industrial Wastewater Treatment Tank Thermal Insulation Membrane Structure Project

Oct. 09, 2020
Share

good news! ! !

   Congratulations to our company for winning the bid for the thermal insulation membrane structure project of the sewage tank of the industrial sewage plant in Kunlun Industrial Zone, Golmud Industrial Park. This project is located in Golmud City, Haixi Mongolian and Tibetan Autonomous Prefecture, and is the first domestic ETFE membrane structure sewage tank capping project.

   The project mainly constructs the installation of the second settling tank, hydrolysis acidification tank and pre-sedimentation tank for the first phase of the 25,000 cubic meters/day industrial sewage treatment plant in the Kunlun Industrial Zone of Golmud Industrial Park. The project uses 230 tons of steel, and the expanded area of the membrane structure is 5,000 square meters.

微信图片_20201008155529.png

微信图片_202010081555293.png

微信图片_202010081555295.png

   Thanks to the trust of the leaders of the owner unit, we will redouble our efforts to achieve the highest quality of the project and complete the project safely and smoothly within the specified construction period.

Home About WanhaoETFEPTFESpace Steel StructureWanhao ProjectsUnder ConstructionNewsContact Us
  • Service Line: +86 574 2886 7851 +86 18658257258
  • Business negotiation telephone: +86 130 2895 3357
  • Fax: +86 574 8849 2906
  • E-mail: sales@whmembrane.com
  • Address: 9F, Canghai Building, No.3388 Canghai Road, Ningbo, Zhejiang, China

Copyright © Ningbo Wanhao Space Structure Engineering Co., Ltd. All Rights Reserved.   

Sitemap | Technical Support   

Send a Message
Top