Ningbo Wanhao Space Structure Engineering Co., Ltd. Industry leader brand
Business Line:

+86 13028953357

Home About Wanhao Wanhao Projects Contact Us

Search

Home / News / Wanhao News

Inner Mongolia Energy Changcheng No.5 coal preparation plant steel framework membrane shed construction project completed

Jul. 23, 2021
Share

Inner Mongolia Energy Changcheng No.5 coal preparation plant steel skeleton membrane shed construction project is located in the coal preparation plant of Changcheng No.5 coal mine, Shanghai Miao Town, Etuokeqian banner, Inner Mongolia.

The height of membrane structure canopy steel structure of this project is 40 meters, the span is 115 meters, and the expanded area of membrane structure is 25000 square meters.

1、 Drawing deepening

微信图片_202002101602432.jpg

微信图片_20200210160243.jpg

1.jpg

2、 Site construction

微信图片_2021041312472913.jpg

微信图片_20210524081051.jpg

微信图片_202105240810525.jpg

3、 Project completion

微信图片_202107191052325.jpg

微信图片_20210719105232.jpg

微信图片_202107191052328.jpg

At present, the project has been completed perfectly, you can enjoy its style.

Home About WanhaoETFEPTFESpace Steel StructureWanhao ProjectsUnder ConstructionNewsContact Us
  • Service Line: +86 574 2886 7851 +86 18658257258
  • Business negotiation telephone: +86 130 2895 3357
  • Fax: +86 574 8849 2906
  • E-mail: sales@whmembrane.com
  • Address: 9F, Canghai Building, No.3388 Canghai Road, Ningbo, Zhejiang, China

Copyright © Ningbo Wanhao Space Structure Engineering Co., Ltd. All Rights Reserved.   

Sitemap | Technical Support   

Send a Message
Top