Ningbo Wanhao Space Structure Engineering Co., Ltd. Industry leader brand
Business Line:

+86 13028953357

Home About Wanhao Wanhao Projects Contact Us

Search

Home / News / Wanhao News

​Ningbo Tennis Center Membrane Structure of the second phase Project is Under Construction

Nov. 01, 2019
Share

Ningbo Tennis Center Membrane Structure of the second phase Project is located in No.199 Wenhua Road, Shounan Street,Yinzhou District, Ningbo City. The whole project uses 220 tons of steel and the membrane expended area is 6,000 square meters.

Ningbo Tennis Center Membrane Structure of the second phase Project is Under Construction

Ningbo Tennis Center Membrane Structure of the second phase Project is Under Construction

Ningbo Tennis Center Membrane Structure of the second phase Project is Under Construction

The project is a single-piece tennis court hood and  he skeleton structure system. The project is used to integrate leisure, sports and landmark buildings.  The steel structure adopts Q235B high-frequency welded pipe, and the membrane is made of imported architectural membrane and the color is white.  The structure includes four materials: membrane, steel pipe, steel cable and bead.  The membrane is close to the arch, and the four sides are fixed on the special membrane.  The membrane surface is curved and arched smoothly, the structure is smooth and simple, beautiful and generous, and it is very dynamic. The overall architectural shape integrates practical functions and landscapes. It has good light transmission and heat insulation performance. It is rich in modern atmosphere and magnificent, showing corporate image.

Ningbo Tennis Center Membrane Structure of the second phase Project is Under Construction

Ningbo Tennis Center Membrane Structure of the second phase Project is Under Construction

Ningbo Tennis Center Membrane Structure of the second phase Project is Under Construction

Ningbo Tennis Center Membrane Structure of the second phase Project is Under Construction

Ningbo Tennis Center Membrane Structure of the second phase Project is Under Construction

Ningbo Tennis Center Membrane Structure of the second phase Project is Under Construction

At present, the main steel structure is about to be hoisted and the final membrane fabric stage is entered.

We are look forward to the completion of the project, adding to the glory of  Wanhao.

ETFE TRANSPARENT MEMBRANE STRUCTURE


Home About WanhaoETFEPTFESpace Steel StructureWanhao ProjectsUnder ConstructionNewsContact Us
  • Service Line: +86 574 2886 7851 +86 18658257258
  • Business negotiation telephone: +86 130 2895 3357
  • Fax: +86 574 8849 2906
  • E-mail: sales@whmembrane.com
  • Address: 9F, Canghai Building, No.3388 Canghai Road, Ningbo, Zhejiang, China

Copyright © Ningbo Wanhao Space Structure Engineering Co., Ltd. All Rights Reserved.   

Sitemap | Technical Support   

Send a Message
Top