The Australian tennis court building project is located in the far southern Hemisphere of Oceania, 2,600km away from the southernmost tip of China in the northern hemisphere. The project uses 400 tons of steel and covers an area of 15,000 square meters with PVDF membrane. Wanhao undertook the overall project design, structural design and steel film structure processing.
The goal for a humid subtropical climate, warm sunshine in winter, hot and humid summer, after taking into full consideration the needs of the owners and USES, Wanhao group in accordance with the Australian standards and local load calculation of steel structure and membrane structure nodes, strive to provide customers with the most lightsome structure modelling, and cooperate with the lighting effect.
Steel structure adopts full flange connection, the maximum span is 40 meters, Wanhao factory adopts the most advanced processing technology, the most strict quality control, pre-assembly smoothly after the completion of production, to ensure that the owner of the installation size is correct.
At present, the project is being shipped in succession.
Wanhao adheres to the attitude of "service first" and makes every effort to improve its projects, thus accumulating rich experience for export projects.
Copyright © Zhejiang Wanhao Group Co., Ltd. All Rights Reserved.
Sitemap | Technical Support