Search
Ningbo stadium tennis Center membrane structure project was won by our company EPC and was responsible for design and construction. Structure with a maximum span of 60meters, the highest point is 48meters, and steel usage is 770tons, membrane expansion is 11,000㎡.
Copyright © Zhejiang Wanhao Group Co., Ltd. All Rights Reserved.
Sitemap | Technical Support